1 00:00:05,829 --> 00:00:03,270 the spacewalk today uh 2 00:00:08,310 --> 00:00:05,839 saw the two crew members uh suiting up 3 00:00:10,629 --> 00:00:08,320 conducting some light exercise uh in the 4 00:00:12,789 --> 00:00:10,639 equipment lock uh kade rubens on the 5 00:00:15,110 --> 00:00:12,799 left jeff williams on the right as they 6 00:00:17,029 --> 00:00:15,120 prepared to move into the crew lock 7 00:00:20,550 --> 00:00:17,039 section of quest to have the hatch 8 00:00:21,269 --> 00:00:20,560 closed behind them and to depressurize 9 00:00:22,870 --> 00:00:21,279 the 10 00:00:24,150 --> 00:00:22,880 crew lock section 11 00:00:29,990 --> 00:00:24,160 the 12 00:00:32,229 --> 00:00:30,000 battery power at 704 am central time and 13 00:00:34,870 --> 00:00:32,239 quickly made their way outside of the 14 00:00:37,350 --> 00:00:34,880 quest airlock to begin to set up all of 15 00:00:40,069 --> 00:00:37,360 their tools and equipment for the major 16 00:00:42,069 --> 00:00:40,079 tasks that lie ahead that being the 17 00:00:44,549 --> 00:00:42,079 installation of the first international 18 00:00:46,470 --> 00:00:44,559 docking adapter to pressurized mating 19 00:00:48,630 --> 00:00:46,480 adapter number two 20 00:00:50,709 --> 00:00:48,640 copy that thanks for the photos the crew 21 00:00:53,110 --> 00:00:50,719 made their way uh towards the forward 22 00:00:56,470 --> 00:00:53,120 end of the harmony module to which a 23 00:00:59,750 --> 00:00:56,480 pma2 is located and used to serve as the 24 00:01:02,790 --> 00:00:59,760 docking port for visiting space shuttles 25 00:01:05,109 --> 00:01:02,800 at that point as you can see uh 26 00:01:07,350 --> 00:01:05,119 kate rubin's on the bottom of your 27 00:01:08,390 --> 00:01:07,360 picture jeff williams on the top began 28 00:01:09,590 --> 00:01:08,400 to hook up 29 00:01:12,230 --> 00:01:09,600 connections 30 00:01:14,390 --> 00:01:12,240 for hook power and heaters uh two 31 00:01:16,870 --> 00:01:14,400 pressurized between pressurized mating 32 00:01:19,590 --> 00:01:16,880 adapter number two and the international 33 00:01:21,510 --> 00:01:19,600 docking adapter itself that paved the 34 00:01:24,469 --> 00:01:21,520 way for commands to be sent from a 35 00:01:27,830 --> 00:01:24,479 control panel by onishi inside 36 00:01:30,550 --> 00:01:27,840 the harmony module to close two 37 00:01:33,270 --> 00:01:30,560 sets of hooks 12 hooks in all that hard 38 00:01:35,190 --> 00:01:33,280 mated the ida to pressurized mating 39 00:01:38,630 --> 00:01:35,200 adapter number two 40 00:01:41,190 --> 00:01:38,640 after that was over with uh the crew 41 00:01:43,590 --> 00:01:41,200 took a moment to document all of the 42 00:01:46,469 --> 00:01:43,600 activities and complete the uh 43 00:01:48,230 --> 00:01:46,479 reconfiguration of connectors uh uh in 44 00:01:50,630 --> 00:01:48,240 the international docking adapter that 45 00:01:52,710 --> 00:01:50,640 will accommodate power to the forward 46 00:01:55,429 --> 00:01:52,720 end of the ida that will accept the 47 00:02:02,069 --> 00:01:55,439 arrival of u.s commercial crew vehicles 48 00:02:06,709 --> 00:02:04,069 one of the big steps of course was the 49 00:02:10,229 --> 00:02:06,719 removal of a large thermal cover by 50 00:02:12,949 --> 00:02:10,239 rubens and williams to expose the actual 51 00:02:15,990 --> 00:02:12,959 docking port to which the spacex crew 52 00:02:18,710 --> 00:02:16,000 dragon and the boeing cst-100 starliner 53 00:02:27,430 --> 00:02:18,720 vehicles will link up to in the years 54 00:02:32,390 --> 00:02:29,670 all of that work was completed very 55 00:02:33,110 --> 00:02:32,400 early on in the eva with no problems at 56 00:02:38,229 --> 00:02:33,120 all 57 00:02:39,830 --> 00:02:38,239 yet another cable along the harmony 58 00:02:42,309 --> 00:02:39,840 module towards 59 00:02:43,750 --> 00:02:42,319 pressurized mating adapter number two at 60 00:02:46,470 --> 00:02:43,760 the forward end 61 00:02:49,350 --> 00:02:46,480 that will accommodate the installation 62 00:02:50,949 --> 00:02:49,360 of the next international docking 63 00:02:54,710 --> 00:02:50,959 adapter that will be launched in late 64 00:02:56,949 --> 00:02:54,720 2017 on a space x dragon cargo craft 65 00:02:59,830 --> 00:02:56,959 that will be mated to the space facing